Short answer: a change order is a written change to your remodeling contract. It describes what is changing, what it costs and how it affects the schedule, and both you and the contractor agree to it before that work is done. It is how a project stays free of surprises at the end.

When is a change order needed?

  • You change your mind. A different tile, an added niche, a second light fixture.
  • Demolition uncovers something. An old leak, damaged framing or outdated plumbing behind the wall.
  • A material is unavailable. The item you chose is discontinued or delayed, and a substitute is needed.
  • You add work. "While you're here, can you also..." is the most common change order of all.

What should a change order include?

  • A clear description of the change.
  • The cost, or the credit if something is being removed.
  • The effect on the schedule, if any.
  • Agreement from both sides before the work starts.

If a contractor says "we'll sort it out at the end", ask for it in writing now. The end of a project is the worst time to find out what something cost.

Can a change order lower the price?

Yes. If you remove something from the scope or choose a less expensive material, the change order should show a credit.

How do you keep change orders to a minimum?

  • Decide everything before construction starts. Materials, layout and details. See how to prepare your home for a remodel.
  • Get a detailed scope. The more specific the written proposal, the fewer gaps there are to fill later.
  • Ask what is not included. Exclusions are where surprises hide.
  • Accept that some cannot be avoided. Nobody can see behind a wall before it is opened.

What about hidden damage?

This is the change nobody chooses. When demolition uncovers damage, you should be told right away, shown the problem and given the cost in writing before it is repaired. What should never happen is finding it on the final invoice.

How Trevix Builders handles changes

Every change is written up as a change order with the price before that work is done. If something unexpected comes up, you hear about it immediately and we deal with it then, not at the end of the project. One client put it this way in a review: "Every change order was clear, fair, and transparently priced." You can read our reviews.

What to ask before you sign with any contractor

  • How do you handle changes during the job?
  • Will I get the price in writing before the extra work is done?
  • Can I see what one of your change orders looks like?
  • What happens if you find damage behind the wall?

More in our guide to hiring a remodeling contractor in San Diego.

Next step

Request a free in-home consultation and written estimate, or read our FAQ.

Quick answers

What is a change order in a remodel?

A change order is a written change to your remodeling contract. It describes what is changing, what it costs and how it affects the schedule, and it is agreed before that work is done.

Can a change order reduce the price?

Yes. If something is removed from the scope or a less expensive material is chosen, the change order should show a credit.

What happens if a contractor finds hidden damage?

You should be told right away, shown the problem and given the cost in writing as a change order before it is repaired.