Bathroom Remodeling in San Diego County
Walk-in showers, tub-and-shower combos, tile, vanities and fixtures, built by a licensed, family-owned team from Poway.
Bathrooms are most of our recent work, and the details matter: tile that lines up, niches that are framed and waterproofed properly, glass that fits, and fixtures placed where you actually reach for them.
One team coordinates the work, from demolition and plumbing or electrical updates to waterproofing, tile, vanity, glass, lighting and paint, so you have one point of contact and one written proposal.
Walk-in showers
Showers with frameless or sliding glass, benches and niches.
Tub-and-shower combos
Soaking tubs with full tile surrounds and glass doors.
Freestanding tubs
Primary baths built around a freestanding tub.
Tile
Herringbone, large-format, terrazzo-look, pebble floors and mosaic niches.
Vanities & counters
Wood or painted vanities with quartz or stone tops.
Leak repairs
Rebuilding bathrooms after leak damage.
Recent bathroom remodels

Primary Bathroom Remodel in Carmel Valley
Freestanding soaking tub, marble-look walk-in shower and charcoal walls.
View project
Terrazzo-Look Bathroom Remodel in Carlsbad
Terrazzo-look tile, a white oak vanity with colorful knobs and a deep soaking tub.
View project
Two-Bathroom Remodel in Oceanside
A tub-shower and a walk-in shower with herringbone tile and brushed gold fixtures.
View project
Marble-Look Bathroom with Walnut Vanity in Carlsbad
Large marble-look tile, a stone hexagon niche and a walnut vanity.
View projectWhat a typical project can include
Your written proposal lists exactly what's included, which materials are supplied by us or by you, who is responsible for permits, and any exclusions.
- Demolition and haul-away
- Plumbing updates for valves, drains and fixtures
- Electrical updates for lighting, fan and outlets
- Shower or tub waterproofing
- Wall, floor and niche tile
- Vanity, countertop and sink
- Toilet, faucets and shower fixtures
- Shower glass
- Paint and trim
- Final walkthrough
Permits
Permit requirements depend on your project's scope and on which city or County department covers your home. Like-for-like updates can still need a permit, and a "no-plan" permit is still a permit. In the City of San Diego, for example, a kitchen or bathroom remodel with no changes to structural elements, wall framing or exterior walls and no added plumbing fixtures may qualify for a no-plan building permit, while moving walls or adding fixtures needs plan review.
How long our recent projects took
Construction time once work began. Your proposal includes a schedule for your project; permit review, material lead times and changes can add time.
| Project | Construction time |
|---|---|
| Primary Bathroom Remodel in Carmel Valley | About 3 weeks |
| Terrazzo-Look Bathroom Remodel in Carlsbad | About 3 weeks |
| Two-Bathroom Remodel in Oceanside | About 2–3 weeks per bathroom |
| Marble-Look Bathroom with Walnut Vanity in Carlsbad | About 3 weeks |
From first call to final walkthrough
You'll know the scope, price and schedule before work begins.
Consultation
We visit, listen to what you want and take measurements.
Written estimate
You receive the scope, materials and price in writing.
Construction
We do the work and keep you updated. Changes are priced in writing first.
Final walkthrough
We review the finished work with you and address remaining items.
What clients say
“If you are looking for a contractor who actually listens, doesn't use high-pressure sales tactics, and delivers top-tier work on time, hire Trevix Builders. … The crew stayed right on schedule, and they were incredibly patient with us when we requested a few changes along the way. Every change order was clear, fair, and transparently priced.”
“We had an excellent experience with Trevix Builders remodeling both of our bathrooms! From start to finish, the entire team was professional, communicative, and a pleasure to work with. … We couldn't be happier with the results and highly recommend Trevix Builders to anyone considering a remodel.”
“Trevix Builders did an outstanding job restoring our master bathroom after a leak. The entire process was smooth from start to finish, and the quality of the work exceeded our expectations. Nate was fantastic to work with—he was professional, communicative, and made sure every detail was taken care of.”
Bathroom Remodeling questions
How long does a bathroom remodel take?
Our recent bathroom remodels in Carlsbad, Oceanside and Carmel Valley took about 2–3 weeks each once construction started. Your project may differ depending on scope, material lead times and permits, so your written proposal includes a schedule.
Can you convert my tub into a walk-in shower?
Yes. We remove the tub, build and waterproof the new shower, and finish it with tile and glass. Moving the drain or valve can affect permit requirements.
How much does a bathroom remodel cost?
It depends on size, layout changes, tile and fixtures. After a free visit, we give you a written estimate for your bathroom.
Do I need a permit for a bathroom remodel?
It depends on scope and jurisdiction. Moving plumbing, adding circuits or changing walls typically needs a permit, and even simpler remodels may need a no-plan permit in some cities. We'll review your scope with you, and your proposal states who is responsible for permits.
What if it's the only bathroom in the house?
It's doable, but it changes the plan. Ordering fixtures and finishes before demolition helps keep the bathroom out of service for less time, and we'll talk through the schedule with you up front.
Can you make my bathroom easier to use as we get older?
Yes. Blocking for grab bars, a low-curb shower, a bench, a handheld shower and lever handles are easiest to plan before construction starts.
Request a free consultation
Here's what happens after you reach out:
- We contact you to learn about your project and set up a time. Photos help us prepare.
- We visit your home, see the space and take measurements. No cost.
- You receive a written estimate with scope, materials and price. No pressure to sign.