It's the first question most homeowners ask. Our recent bathroom remodels in Carlsbad, Oceanside and Carmel Valley each took about 2–3 weeks once construction started. Here's how a typical project is sequenced and what can change the timeline.
Before construction: planning, ordering and permits
You'll have a consultation, a written estimate and time to choose tile, vanity, fixtures and glass. Ordering materials before demolition helps keep the construction phase short. If your project needs a permit, review time comes before construction.
Demolition, plumbing and electrical
The old finishes come out, and hidden problems like old leaks or damaged framing show up here. Plumbing and electrical are then updated for the new layout, valves, lighting and outlets.
Waterproofing and tile
The shower or tub area is waterproofed before tile goes on. Detailed patterns such as herringbone or mosaic niches take longer than large-format tile.
Vanity, fixtures, glass and finish work
The vanity and top go in, fixtures are installed, and paint and trim are finished. Shower glass is usually measured after tile is done.
What can add time
- Layout changes: moving a toilet, drain or valve.
- Hidden damage: repairs found during demolition.
- Lead times: custom vanities, specialty tile or glass.
- Permit review: depends on scope and jurisdiction.
- Changes mid-project: written up as change orders with price and schedule impact.
Plan for a second bathroom
The bathroom is out of service during the remodel. If it's your only one, tell us at the consultation so the schedule can account for it.